SEAI-registered · NSAI-certified

External wall insulation in Donabate

Start with your Donabate Eircode and exterior photos. We turn them into a wall-by-wall starting plan, then confirm whether your home needs a site visit.

Up to €8,000 SEAI grant · whole-surface external wrap

SEAI contractor ID 17645 · Kildare

NSAI ETICS IAB/E526.1

Local external wrap specialists

Serving Donabate, Dublin

Planning a wrap around your home

Donabate homes need more than a generic square-metre estimate. The existing wall finish, coastal exposure, extensions, openings, vents, services and scaffold access all affect how an external wrap should be specified. Our first review organises those details around the actual exterior of your home.

Donabate is within our North County Dublin service area. Because it is a coastal location, we pay particular attention to exposed elevations, the condition of the existing render and any signs that need investigation before insulation is proposed. External insulation improves the building envelope, but it should not be used to hide unresolved damp or defective render.

Fingal County Council is the local planning authority. External wall insulation may be exempted development where the relevant conditions are met, but protected structures, Architectural Conservation Areas and changes affecting the character of a property need an individual planning check.

Check Fingal County Council planning guidance
Donabate photo quote Start with the house, not a rough estimate.

A few clear photos and the Eircode give us enough information to organise the property wall by wall before anyone travels.

Find the property Use the Eircode to confirm the correct Donabate address.
Show every elevation Photograph the front, rear, accessible sides and extensions.
Receive a clearer next step We review feasibility and explain what still needs to be confirmed.
Photo-to-plan review

Your photos become useful project information

We match the exterior images to the address and organise the visible walls, openings and features into a practical starting plan.

  • Front, rear and accessible side elevations
  • Windows, doors, sills and extension junctions
  • Vents, meter boxes, pipes and external fittings
  • Visible cracks, staining or changes in wall finish
Donabate conditions

Review exposed walls before specifying the system

Coastal weather and the existing render condition can affect preparation and detailing. Anything that needs closer inspection is identified before the proposal is finalised.

  • Existing render or pebbledash condition
  • Exposed elevations and weathering
  • Damp or cracking that needs investigation
  • Scaffold access and safe working space
Written proposal

Know what the wrap is expected to include

The proposal records the intended coverage, finish and practical assumptions, including the items that need an on-site confirmation.

  • Whole-surface insulation coverage
  • Finish, sill, reveal and trim direction
  • Ventilation and external-service details
  • Grant, planning and survey actions still required
External insulation and SEAI grant rules

The requirements that shape a whole-surface wrap

Whole-surface insulation

For the individual SEAI EWI grant, all external walls must be insulated. Insulating only the front or one side does not qualify.

Before work starts

For an eligible grant project, the home must meet the SEAI requirements, the homeowner applies with the MPRN, and the grant offer is accepted before work begins.

Building regulations

A full wrap can be a major renovation under Part L. Attic insulation or heating upgrades can form part of the project where needed to meet the required energy outcome.

Planning and traditional homes

Planning permission can be required depending on the house and local authority. Pre-1940 or traditional stone and brick homes need a separate moisture and fabric review.

Your project file

What you receive at handover

These project-specific records are prepared for the completed home. Additional safety or service records are added only where they apply.

EWI completion and handover record

Project summary with the installed system, completion checks and handover status for your home.

FAST ETICS warranty card

Manufacturer warranty for the insulation system installed on your property.

EWI care and maintenance guide

How to inspect, clean and maintain the external finish, fixings and service penetrations.

Post-works BER certificate

Issued by your BER assessor after the post-works assessment is published.

View grant documents and official guides
System and key terms

The system, responsibilities and grant route

The project specification, finish and installation details are confirmed in the written proposal.

System

We install the FAST EcoBuild External Insulation System supplied by FEB and covered by NSAI Agrément Certificate No. 12/0368.

Insurance

Employers' Liability and Public Liability cover are held for our works. Policy details are available on request.

Planning

The homeowner is responsible for obtaining planning permission where it is required.

Grant compliance

For eligible SEAI projects, the system and work are specified in line with applicable SEAI and NSAI requirements. Grant eligibility and approval depend on the property and project.

Our project process

The steps we follow for every wrap

This is the same operational sequence set out in our project roadmap, from feasibility through to the SEAI completion process.

1Photo and Eircode review

You send the Eircode and exterior photos. We organise the property wall by wall, review visible features and decide what needs an on-site check.

2Site confirmation and quotation

Where a visit is needed, we confirm measurements, access and condition before setting out the system, finish, sills, ventilation, scaffolding and relevant upgrades.

3Review and accept the proposal

The client reviews and accepts the agreed scope, specification, contract value, payment terms and estimated duration.

4Grant strategy and approval

Where using the SEAI route, grant conditions are reviewed, the homeowner applies and accepts the offer before grant-supported work begins.

5Installation works on site

Scaffold is erected, walls are prepared, sills are replaced, insulation and mesh system are fitted, then the chosen finish is applied.

6Post-works BER and completion

The BER and required declaration paperwork are completed for the grant file, followed by the homeowner grant claim.

Read the full project roadmap

Donabate, Dublin FAQ

Do you cover Donabate and the surrounding North County Dublin area?

Yes. Donabate is within our North County Dublin service area. Start with the property Eircode so we can confirm the address and review the project before arranging any visit.

Can I start a Donabate external wall insulation quote from photos?

Yes. Send clear front, rear and accessible side photographs. We combine them with your address and available map information to prepare a wall-by-wall starting plan and explain what needs checking next.

Does Donabate's coastal location affect an external wrap?

Exposure and the existing render condition are part of the review. The specified system must suit the substrate and the elevations, and unresolved damp, cracking or defective render should be investigated before insulation is installed.

Who should I check with about planning in Donabate?

Fingal County Council is the local planning authority. Some external insulation can be exempted development when the relevant conditions are met, but the property and proposed appearance still need to be checked individually.

Planning external wall insulation for your home?

Get a free quote when you are ready. The quote page lets you choose whether to send exterior photos or arrange a site visit.

Get a free quote

Nearby places we serve

SEAI and NSAI accreditations for Energy Retrofit Horizons Ltd